Choose Your Country or Region

Other Countries and Regions

  • Other Countries and RegionsEnglish

Asia/Pacific

  • Việt namTiếng Việt
  • پاکستاناردو
  • Thailandภาษาไทย
  • MalaysiaEnglish
  • AustraliaEnglish

Europe

  • PortugalPortuguês
  • FranceFrançais
  • ItaliaItaliano
  • United KingdomEnglish
  • RomâniaRomâna
  • DACH-RegionDeutsch
  • LietuvaLietuvių
  • PolskaPolski
  • УкраїніУкраїнська
  • BeneluxNederlands

Americas

  • América LatinaEspañol
  • BrasilPortuguês

Middle East and Africa

  • South AfricaEnglish
0:38

Pakistan | SolisStorage EverCore Powers ShahTaj Textile in Lahore: Commercial Energy Storage Case Study

Pakistan

6 2
Share:

This 38-second case study video documents a commercial and industrial (C&I) energy storage deployment by SolisStorage at ShahTaj Textile, a textile manufacturer in Lahore, Pakistan. The installed solution is the SolisStorage C&I ESS EverCore, an all-in-one cabinet rated at 261 kWh of energy capacity and 125 kW of power, integrating battery modules, inverter and PV switchgear in a single outdoor enclosure. Footage highlights the system's "Engineered for Simplicity" and "Built to Last" design principles, showing clean battery-module wiring, integrated DC and PV connections, and straightforward commissioning. The video also captures on-site product training for local engineers and a project team photo at handover, reinforcing SolisStorage's brand promise: "Move Energy to the Right Place at the Right Time, Through Simple, Reliable Systems that Installers Trust." Relevant for Pakistani industrial businesses, textile factories facing rising tariffs and grid instability, and EPC/installer partners evaluating modular C&I battery storage.


ShahTaj Textile Mills

Country: Pakistan

Project location: Lahote

Capacity (DC) of entire project, and portion of project supplied by reporting supplier if not 100%: 4.8 MW

Energy Storage System: EVERCORE - 1 UNIT

Project scenario highlights/features: Energy Curtailment / uninterupter supply to the Conpressor (the heart of textile mills) / to overcome peak hour electricity proces